CR 112 Water Line Extension – Round Rock, Texas

CR 112 Water Line Extension – Round Rock, Texas2017-08-30T11:54:02+00:00

Project Description

Project Description: The need for extending the County Road 112 Water Line is to provide a direct service to proposed developments directly south of the roadway.  KPA prepared a preliminary engineering report that identified alignment alternatives, study the viability of each alternative, and recommend a preferred alignment for City Staff and City Council.  KPA is currently in the final design phase (85% complete).  The proposed 24-inch water line extension is approximately 6,200 linear feet along and consists of a PRV Installation, air release valves, fittings, fire hydrants, roadway bore and a bore under 3 – 18-inch gas lines.

Scope of Services Provided:  Preliminary design, permits, preparation of plans, specifications and easement documents, Bidding, Review of Bids and Recommendation to Award Contract and Construction Administration.

Construction Cost: $1,545,000 (OPC)