Kelly Lane Roadway and Drainage Improvements, Phase I – Pflugerville, Texas

Kelly Lane Roadway and Drainage Improvements, Phase I – Pflugerville, Texas2017-08-30T11:53:53+00:00

Project Description

Project Description: Street, drainage and water improvements. In addition to widening nearly 3,100 linear feet of 22-foot wide rural road section to a 4-lane urban section (curb and gutter, storm sewer, lighting, etc.) from Murchison Ridge to Falcon Pointe Blvd., this project included over 3,500 linear feet of street rehabilitation from Falcon Pointe Blvd. to Moorlynch Ave. The rehabilitation work also included 8-inch cement stabilization with a 2-inch Type ā€˜Cā€™ asphalt overlay and restriping.

Scope of Services Provided: Preliminary planning and design as well as design and construction surveys, final design, bidding, construction administration, and onsite representation.

Construction Cost: $5,180,303