Project Description: Pecan Branch Wastewater Interceptor consisted of the installation of approximately 3,110 linear feet of 18-inch to 21-inch wastewater line to connect two existing manholes and divert flow around an existing subdivision. The project is located in northwest Georgetown and is bordered by Northwest Boulevard in the west and the Georgetown Airport in the east.

Construction Cost: $480,126